Valley & Whitney Planned Unit Development Project
The proposed project entails development of a new residential subdivision of 204 homes in the area of Alessandro Blve, Olive St., and Brodiaea Avenue.
Overall, the project consists of:
- Subdivision of 26.74 acres of vacant land into 204 lots ranging in size from 2,800 square feet to 5,306 square feet (predominant lot sizes are 2,800 square feet and 3,600 square feet)
- Construction of 204 new single-family detached homes ranging in size from 1,575 square feet to 2,384 square feet with attached two-car garages
Site development would include:
- Grading and construction of single-family residential lots
- Four retention/water quality basins,
- One approximately 1.80-acre park
- Guest parking areas
- Underground utilities
- Street improvements
- Common-area landscaping
- Perimeter fencing
- Related off-site improvements
Valley & Whitney Project
Project Map

Environmental Review Documents
Notice of Intent | Notice of Completion & Environmental Transmission | Initial Study and Mitigated Negative Declaration
Technical Appendices
Moreno Valley Business Center
The Project consists of a proposal for a Plot Plan (PEN20-0162) that provides for the development of one 164,187 square foot light industrial building. The proposed Project design includes:
- a loading area
- auto parking areas
- landscaping
- signage
- lighting
- off-site improvements
The Project also includes the construction of an off-site public storm drain segment and an upgraded water pump for the Box Springs Municipal Water Company
Moreno Valley Business Center
Project Map

Environmental Review Documents
Notice of Intent | Mitigated Negative Declaration
Technical Appendices
- Appendix A: Air Quality
- Appendix A2: Mobile Source Health Risk Assessment
- Appendix A3: Supplemental Air Quality Impact Analysis
- Appendix A4: Construction Healht Risk Assessment
- Appendix B: Biological Resources Assessment
- Appendix C: Cultural Resource Survey
- Appendix D: Geotechnical Evaluation
- Appendix E: Energy Analysis
- Appendix F: Greenhouse Gas Analysis
- Appendix G: Site Assessment
- Appendix H: Paleontological Assessment
Moreno Valley Mall Redevelopment
The Project proposes revitalization and redevelopment of a portion of the existing Moreno Valley Mall (excluding the existing JC Penny and Macy's parcels).
Key features of the concept plan include:
- Remodeling the overall mall site and mall interior
- Adding four multi-family residential communities totaling 1,627OU
- Adding two new hotels operating within a single hotel building
- Adding a new three-story office building of approximately 60,000SF
- Repurposing the existing food court into a pavilion style food market
- Repurposing the existing Sears building to allow for multi-tenant retail and related uses
- Redesigning the existing Theater area to include outdoor patio dining
- Adding a new parking structure
- Adding a central plaza and park integrated into the southeastern multi-family communities
- Relocating the existing transit stops
- Providing related infrastructure improvements including offsite traffic improvements
Moreno Valley Mall Redevelopment Downloads
Recirculated Notice of Preparation of Draft Subsequent Environmental Impact Report |
Project Map
Tentative Tract Map 37725
The project consists of Tentative Tract Map 37725 to subdivide approximately 20.18 acres into 66 single-family residential lots ranging in size from 7,212 square feet to 15,951 square feet with associated improvements including streets, sidewalks and 1 lettered lot for water quality requirements.
Tract Map 37725 Downloads
Notice of Intent | Draft Initial Study and Mitigated Negative Declaration (ISMND) | Draft ISMD Technical Appendices |
Project Map
Edgemont Commerce Center
The project site is located on the south side of Bay Avenue west of Day Street.
The project includes:
- Change of Zone to change the zoning designation from Business Park to Light Industrial; and
- Tentative Parcel Map to consolidate the two parcels into one 6.6 acre parcel referred to as Lot 1:and
- Plot Plan for the development of the Edgemont Commerce Center project as a 142,325 square foot warehouse building.
Edgemont Commerce Center Review Documents
Project Map

Environmental Review Documents
Notice of Preparation of a Draft Environmental Impact Report
Cottonwood Village
The project site is located on the north side of Cottonwood Avenue approximately 525 feet east of Perris Boulevard.
The project includes:
- Tentative Tract Map 34544 for condominium purposes to subdivide approximately 9.4 acres of land; and
- Plot Plan for the development of the Cottonwood Village project consisting of 23 four-plex buildings (92 attached multi-family units) with associated amenities and public improvements.
Cottonwood Village Review Documents
Project Map

Environmental Review Documents
Notice to Adopt a Mitigated Negative Declaration | Initial Study/Mitigated Negative Declaration
Technical Appendices
Arco AM/PM Service Station Project
The project is located at the southeast corner of Redlands Boulevard and Hemlock Avenue.
This project includes:
- An application for a Conditional Use Permit to develop a 2.4-acre portion of a 6.9-acre site with a 6,323-square foot retail building
- Building includes a 5,123-square foot food market with office and storage in a mezzanine level and an adjacent 1,200-square foot retail tenant space
- Fueling stations for gasoline and diesel dispensing within the Highway Office/Commercial (HO/C) District.
Arco AM/PM Service Station Project Review Documents
Project Map
Environmental Review Documents
Notice to Adopt a Mitigated Negative Declaration | Mitigated Negative Declaration
Technical Appendices
(updated 1/13/2022)
- Appendix A:MSHCP Consistency Analysis and Habitat Assessment
- Appendix B: Air Quality and Greenhouse Gas Study
- Appendix C:Jurisdictional Waters and Wetlands Delineation
- Appendix D: Biological Preservation Survey
- Appendix E: Burrowing Owl Survey
- Appendix F: Cultural Resources Survey
- Appendix G: Construction and Operational Energy Report
Heacock Commerce Center
The project is located at the southeast corner of Heacock Street and Gentian Avenue.
This project includes:
- Applications for a General Plan Amendment
- Change of Zone
- Specific Plan Amendment
- Two Plot Plan applications for two high cube industrial buildings totaling 873,967 square feet.
The applicant proposes land use changes that include:
- GPA from R5 to Business Park for approximately 43 acres; and
- Zone Change from R5 to Light Industrial for approximately 43 acres.
The specific plan amendment proposes to remove the parcels on the north side of Revere Place and assign a City General Plan and Zoning designation to those parcels.
Compass Danbe Center Point
The Project consists of:
- a proposal for a General Plan Amendment from Commercial to Business Park (PEN20-0118)
- a Change of Zone from Community Commercial to Light Industrial (PEN20-0119)
- a Tentative Parcel Map No. 37944 (PEN20-0120), and
- two Plot Plans (PEN20-0121 and PEN20-0124) that provide for the development of two light industrial buildings with a total combined building floor area of 389,603 square feet which includes the mezzanines.
The Project also would include cargo loading areas at each building (within an enclosed truck court with loading docks on the south sides of the proposed buildings), parking areas, landscaping, signage, and lighting.
Compass Danbe Center Point
Notice of Availability | Notice of Completion | IS-MIND | Mitigation & Monitoring (MMRP)
Technical Appendices
- Appendix A: Air Quality Impact Analysis
- Appendix A2: HRA Report
- Appendix B1: MSHCP Compliance Analysis
- Appendix B2:JD Report
- Appendix B3 MSHCP DBESP
- Appendix B4: Burrowing Owl Survey Report
- Appendix B5: Least Bells Vireo Survey Report
- Appendix C: Phase 1 Cultural Resources Survey
- Appendix D: Energy Analysis
Project Map
Moreno Valley Trade Center
The Project site is located in the eastern portion of the City of Moreno Valley, Riverside County, California. The Project site is south of Eucalyptus Avenue, west of Redlands Boulevard, and north of Encelia Avenue.
The Moreno Valley Trade Center Project involves:
- A General Plan Amendment to change the land use designation for all parcels within the Project site from “Residential: Max 2 du/ac (R2)” to “Business Park/Light Industrial (BP);”
- A Change of Zone to change the zoning designation for all parcels within the Project site from “from “Residential Agriculture, 2 du/ac (RA2)”and “Primary Animal Keeping Overlay Zone (PAKO)” to “Light Industrial (LI) District;”
- A Plot Plan that provides a development concept (site layout, architecture, and landscaping) for an approximately 1,328,853 s.f. proposed warehouse building would be occupied by either a warehouse distribution/logistics use or a fulfillment center use and supporting office space; and
- A Tentative Parcel Map to consolidate all 11 parcels within the Project site to create one approximately 71.65-net-acre parcel
Moreno Valley Trade Center Downloads
Notice of Availability | Notice of Completion | Draft EIR | Final EIR
Technical Appendices
Project Map
Moreno Valley Comprehensive General Plan Update (MoVal2040)
- Notice of Availability for Draft MoVal 2040 General Plan Update, Draft Climate Action Plan, and General Plan Draft Program Environmental Impact Report (DEIR) documents
- Draft MoVal 2040 General Plan
- General Plan Draft Program Environmental Impact Report (DEIR)
- Draft Climate Action Plan (CAP)
Tentative Tract Map 37725
The project consists of Tentative Tract Map 37725 to subdivide approximately 20.18 acres into 66 single-family residential lots ranging in size from 7,212 square feet to 15,951 square feet with associated improvements including streets, sidewalks and 1 lettered lot for water quality requirements.
Tract Map 37725 Downloads
Notice of Intent | Draft Initial Study and Mitigated Negative Declaration (ISMND) | Draft ISMD Technical Appendices |
Project Map
Town Center at Moreno Valley
The Project includes a proposed Specific Plan and TTM to allow for the development of residential, commercial, civic, and park uses. Access to the Project site would be provided from Cottonwood Avenue, Nason Street, Bay Avenue, and Alessandro Boulevard. In summary, it is anticipated that future development of the Project site pursuant to the proposed Specific Plan would include the following uses:
- Up to 800 homes on approximately 34.8 residential acres
- Neighborhood Commercial Center encompassing approximately 16.5-acres in the southeast portion of the Project site, which will include a minimum of 150,000 square feet [sf] and no more than 220,000 sf of non-residential uses (e.g., office, civic, hotel, retail, restaurant, etc.)
- Future Civic Building Site encompassing 40,000 sf in the Neighborhood Commercial Center area, which will ultimately accommodate an approximately 30,000 sf civic-related building (included in the Neighborhood Commercial Center overall building area of up to 220,000 sf)
- Public Parks consisting of an approximately 1.3-acre linear park and a 3.5-acre park located west and north of proposed commercial area, respectively
The Project is consistent with land use and growth assumptions for the Project site included in the adopted City of Moreno Valley General Plan 2040 (General Plan), which was adopted in June 2021. The Project site has a land use designation of Downtown Center and is zoned Downtown Center (DC) District.
Construction for the Project is expected to be initiated in 2023 and be completed in 2025.
Town Center at Moreno Valley
Revised Town Center at Moreno Valley Specific Plan Notice of Preparation |
Project Map

Moreno Valley Mall Redevelopment
The Project proposes revitalization and redevelopment of a portion of the existing Moreno Valley Mall (excluding the existing JC Penny and Macy's parcels).
Key features of the concept plan include:
- Remodeling the overall mall site and mall interior
- Adding four multi-family residential communities totaling 1,627OU
- Adding two new hotels operating within a single hotel building
- Adding a new three-story office building of approximately 60,000SF
- Repurposing the existing food court into a pavilion style food market
- Repurposing the existing Sears building to allow for multi-tenant retail and related uses
- Redesigning the existing Theater area to include outdoor patio dining
- Adding a new parking structure
- Adding a central plaza and park integrated into the southeastern multi-family communities
- Relocating the existing transit stops
- Providing related infrastructure improvements including offsite traffic improvements
Moreno Valley Mall Redevelopment Downloads
Recirculated Notice of Preparation of Draft Subsequent Environmental Impact Report |
Project Map
Tentative Tract Map 37725
The project consists of Tentative Tract Map 37725 to subdivide approximately 20.18 acres into 66 single-family residential lots ranging in size from 7,212 square feet to 15,951 square feet with associated improvements including streets, sidewalks and 1 lettered lot for water quality requirements.
Tract Map 37725 Downloads
Notice of Intent | Draft Initial Study and Mitigated Negative Declaration (ISMND) | Draft ISMD Technical Appendices |
Project Map
Edgemont Commerce Center
The project site is located on the south side of Bay Avenue west of Day Street.
The project includes:
- Change of Zone to change the zoning designation from Business Park to Light Industrial; and
- Tentative Parcel Map to consolidate the two parcels into one 6.6 acre parcel referred to as Lot 1:and
- Plot Plan for the development of the Edgemont Commerce Center project as a 142,325 square foot warehouse building.
Edgemont Commerce Center Review Documents
Project Map

Environmental Review Documents
Notice of Preparation of a Draft Environmental Impact Report
Cottonwood Village
The project site is located on the north side of Cottonwood Avenue approximately 525 feet east of Perris Boulevard.
The project includes:
- Tentative Tract Map 34544 for condominium purposes to subdivide approximately 9.4 acres of land; and
- Plot Plan for the development of the Cottonwood Village project consisting of 23 four-plex buildings (92 attached multi-family units) with associated amenities and public improvements.
Cottonwood Village Review Documents
Project Map

Environmental Review Documents
Notice to Adopt a Mitigated Negative Declaration | Initial Study/Mitigated Negative Declaration
Technical Appendices
Arco AM/PM Service Station Project
The project is located at the southeast corner of Redlands Boulevard and Hemlock Avenue.
This project includes:
- An application for a Conditional Use Permit to develop a 2.4-acre portion of a 6.9-acre site with a 6,323-square foot retail building
- Building includes a 5,123-square foot food market with office and storage in a mezzanine level and an adjacent 1,200-square foot retail tenant space
- Fueling stations for gasoline and diesel dispensing within the Highway Office/Commercial (HO/C) District.
Arco AM/PM Service Station Project Review Documents
Project Map
Environmental Review Documents
Notice to Adopt a Mitigated Negative Declaration | Mitigated Negative Declaration
Technical Appendices
(updated 1/13/2022)
- Appendix A:MSHCP Consistency Analysis and Habitat Assessment
- Appendix B: Air Quality and Greenhouse Gas Study
- Appendix C:Jurisdictional Waters and Wetlands Delineation
- Appendix D: Biological Preservation Survey
- Appendix E: Burrowing Owl Survey
- Appendix F: Cultural Resources Survey
- Appendix G: Construction and Operational Energy Report
Heacock Commerce Center
The project is located at the southeast corner of Heacock Street and Gentian Avenue.
This project includes:
- Applications for a General Plan Amendment
- Change of Zone
- Specific Plan Amendment
- Two Plot Plan applications for two high cube industrial buildings totaling 873,967 square feet.
The applicant proposes land use changes that include:
- GPA from R5 to Business Park for approximately 43 acres; and
- Zone Change from R5 to Light Industrial for approximately 43 acres.
The specific plan amendment proposes to remove the parcels on the north side of Revere Place and assign a City General Plan and Zoning designation to those parcels.
Compass Danbe Center Point
The Project consists of:
- a proposal for a General Plan Amendment from Commercial to Business Park (PEN20-0118)
- a Change of Zone from Community Commercial to Light Industrial (PEN20-0119)
- a Tentative Parcel Map No. 37944 (PEN20-0120), and
- two Plot Plans (PEN20-0121 and PEN20-0124) that provide for the development of two light industrial buildings with a total combined building floor area of 389,603 square feet which includes the mezzanines.
The Project also would include cargo loading areas at each building (within an enclosed truck court with loading docks on the south sides of the proposed buildings), parking areas, landscaping, signage, and lighting.
Compass Danbe Center Point
Notice of Availability | Notice of Completion | IS-MIND | Mitigation & Monitoring (MMRP)
Technical Appendices
- Appendix A: Air Quality Impact Analysis
- Appendix A2: HRA Report
- Appendix B1: MSHCP Compliance Analysis
- Appendix B2:JD Report
- Appendix B3 MSHCP DBESP
- Appendix B4: Burrowing Owl Survey Report
- Appendix B5: Least Bells Vireo Survey Report
- Appendix C: Phase 1 Cultural Resources Survey
- Appendix D: Energy Analysis
Project Map
Moreno Valley Trade Center
The Project site is located in the eastern portion of the City of Moreno Valley, Riverside County, California. The Project site is south of Eucalyptus Avenue, west of Redlands Boulevard, and north of Encelia Avenue.
The Moreno Valley Trade Center Project involves:
- A General Plan Amendment to change the land use designation for all parcels within the Project site from “Residential: Max 2 du/ac (R2)” to “Business Park/Light Industrial (BP);”
- A Change of Zone to change the zoning designation for all parcels within the Project site from “from “Residential Agriculture, 2 du/ac (RA2)”and “Primary Animal Keeping Overlay Zone (PAKO)” to “Light Industrial (LI) District;”
- A Plot Plan that provides a development concept (site layout, architecture, and landscaping) for an approximately 1,328,853 s.f. proposed warehouse building would be occupied by either a warehouse distribution/logistics use or a fulfillment center use and supporting office space; and
- A Tentative Parcel Map to consolidate all 11 parcels within the Project site to create one approximately 71.65-net-acre parcel
Moreno Valley Trade Center Downloads
Notice of Availability | Notice of Completion | Draft EIR | Final EIR
Technical Appendices
Project Map
Moreno Valley Comprehensive General Plan Update (MoVal2040)
- Notice of Availability for Draft MoVal 2040 General Plan Update, Draft Climate Action Plan, and General Plan Draft Program Environmental Impact Report (DEIR) documents
- Draft MoVal 2040 General Plan
- General Plan Draft Program Environmental Impact Report (DEIR)
- Draft Climate Action Plan (CAP)
Tentative Tract Map 37725
The project consists of Tentative Tract Map 37725 to subdivide approximately 20.18 acres into 66 single-family residential lots ranging in size from 7,212 square feet to 15,951 square feet with associated improvements including streets, sidewalks and 1 lettered lot for water quality requirements.
Tract Map 37725 Downloads
Notice of Intent | Draft Initial Study and Mitigated Negative Declaration (ISMND) | Draft ISMD Technical Appendices |
Project Map
Kaiser Permanente Moreno Valley Medical Center Master Plan Project
Kaiser Foundation Hospitals (also known as Kaiser Permanente) is proposing to expand the existing Kaiser Permanente Moreno Valley Medical Center campus. The proposed project would be a multi-phased, state-of-the-art medical center campus, which would include the following at ultimate project build out: approximately 460-bed hospital, hospital support buildings, outpatient medical office buildings, an energy center, and surface and structured parking. The project site is located on the north side of Iris Avenue, west of Oliver, and east of Nason Street at 27300 Iris Avenue.
Kaiser Medical Center Downloads
Notice of Preparation (NOP) and Scoping Meeting | DEIR (403.5 MB) |
FEIR | FEIR Technical Appendices |
Project Map
Indian Street Commerce Center Project
The Project site is located within the southern portion of the City of Moreno Valley, in western Riverside County. The Project site is located approximately one-half mile westerly of Perris Boulevard and is bounded by Indian Street to the east. Grove View Road (alignment) comprises the Project site northerly boundary. March Air Reserve Base is located approximately one-third mile west of the Project site.
Indian St. Downloads
Notice of Preparation (498K) | Initial Study (4.89MB) | Draft EIR (20MB) | Final EIR (29MB)
Project Map
Moreno Valley Logistics Center
The project site is located south of Krameria Avenue, north of Cardinal Avenue, east of Heacock Street, and west of Indian Street in the City of Moreno Valley, Riverside County, California.
MV Logistics Center Downloads
Notice of DEIR (1.85MB) | CEQA Initial Study (13.3MB) | Draft EIR (48MB)
Final FEIR (49MB) | Technical Appendices (408MB)
Project Map
World Logistics Center

World Logistics Downloads
Note: Many of these files are very large and must be downloaded to your local system before viewing. To download files, right-click on the link and select the save link as option.
2020 Revised Final Environmental Impact Report (Revised Final EIR)
Proposed Development Agreement |
Proposed Tentative Parcel Map 36457 Conveyance and Finance Purposes Only |Notice of Completion Letter | Notice of Determination |
Revised EIR: Cover page | Part 1a | Part 1b | Part 1c-1 | Part 1c-2 | Part 1c-3 | Part 1c-4 | Part 1c-5 | Part 1c-6 | Part 1c-7 | Part 1c-8 | Part 1c-9 | Part 1c-10 |Part 1c-11 | Part 1c-12 | Part 1c-13 | Part1c-13-addition to Item Q
Part 2 | Part 3 | Part 4 | Part 4 Vol. 3b | Additional Errata Memorandum | Notice of Determination | Additional Notice of Determination | Final Statement and Overriding Considerations | June 2020 Errata | Final MMRP
Community Response
Letters Sent in Response to the Revised Final EIR: Batch 1–3 | Batch 4–5 | Batch 6 – 8 |
2019 Revised RFEIR Review 11-2019
Draft Recirculated RSFEIR | Draft Recircluated RSFEIR With Tracked Changes
Technical Appendices: A-C | D1- D6 |D7-D11 | E1- E5 |E 6-1 - E- 6- 5| E 6-6 - E- 6-10 | E6-11 - E6-13 | F
Note: the appendices are very large and may not open through the browser. Right click on the link and save them to your local system.
2019 Draft Recirculated Revised Sections of the Final Environmental Impact Report: Notice of Availability
Revised FEIR — July 2018
Revised FEIR Notice | World Logistics Center Revised Sections of FEIR | Revised FEIR with Redlines | Revised FEIR Appendices
Original FEIR and DEIR
World Logistics Center Specific Plan | Notice of DEIR | Project Map | Draft EIR
Final FEIR | Tracking FEIR | Technical Appendices (~1.7 GB)
Initiatives
WLC Land Benefit Initiative | World Logistics Center Development Agreement Initiative | World Logistics Center Land Use and Zoning Entitlements Initiative
Legal
WLC Legal Information
Notice of Determination
Notice
Project Map
Brodiaea Commerce Center Project
The Project site is located in the central portion of the City of Moreno Valley, Riverside County, California. The Project site is located north of Brodiaea Avenue, west of Heacock Street, and approximately 325 feet south of Alessandro Boulevard.
Brodia Downloads
Final EIR (12MB) | Final EIR Technical Appendices (223MB)
Notice of Preparation (100K) | Initial Study (3.49MB) | Draft EIR (17MB)
Technical Appendices (143MB)
Project Map