Translate Page

Moreno Master Drainage Plan Line F-18 and Line F-19

This project will install Storm Drain Lines F-18 and F-19 in Moreno Townsite Area. Line F-18 is in Alessandro Boulevard between Redlands Boulevard and Merwin Street. Line F-19 is in Brodiaea Avenue between Redlands Boulevard and Merwin Street. These two storm drains are to be connected to the existing storm drain Line F-2 running north-south along Redlands Boulevard. The proposed storm drains are to mitigate flooding for the Moreno Townsite Area.